Technical Services
-
 

Installations

The projects division of PES is divided into two main industrial sectors- engineering and construction. The engineering division specialises in the installation of BW Fixator levelling systems and Stolle work holding equipment for a wide variety of industrial machinery and equipment such as machine tools, printing presses, vehicle test/assembly lines, engine test facilities, coordinate measuring machines and special purpose equipment. This expertise is provided on a worldwide basis with a highly trained team of installation and design/production engineers based at our head office in Hinckley, England.

-
-

Project Management

PES can offer a comprehensive project management service to compliment products and serviced offered by PES. We will handle all element of control and coordination from cradle to grave. Typical examples of managed projects to date are installations such as: observatory foundation installation, large seismic mass foundations and crash test wall installations.

-
-

 

Design and Innovation - Mechanical Products and Equipment

We have experience in the design of capital products, production equipment, test equipment, seismic mass design and hydraulic systems design. We can offer an innovative design resource within the capabilities of PES. We have within our team we have one of th UK's leading machine tool designers who designed the first Multi-Axis CNC Machining Centre utilizing synthetic granite as the main material for its structural masses, PES moglice for the linear slideways and PES DWH structural grout to bond together the machine elements.

The experience of the PES design resource is not limited to machine tools but is based upon the design and innovation of over 200 different products or mechanical equipment many of which are still being sold in volume or have been paying back their companies in output over a number of years.
For example, in 2002 we completed the design of a major production installation for the Sub Sea Cable manufacturing industry. The cost of the plant was recovered within the first contract and the availability of the complex has opened up substantial new opportunities and new markets to the company.

Designing in 2D AutoCad and 3D Inventor PES Projects division offers a comprehensive design service.

  1. Assist in the design specification, market analysis and investment appraisal for the equipment
  2. Innovate your new product or process presenting you with conceptual designs and sketches
  3. Study the feasibility of the design including cost analysis
  4. Design the equipment in the form of Autocad 2D and 3D manufacturing Drawings
  5. Produce parts lists, Technical Files and instructions for manufacture
  6. CE Mark the equipment including risk analysis and
  7. Produce data for Instruction Manuals and Training Manuals
  8. Offer engineering support into the future
-
 
 
-

 

 

top